Tuesday 18 March 2014

Day 3 of filming 

The footage from Day 2 was of a better quality then Day 1 by a long run. There were no shaking of the camera where it was not handled properly, we did not zoom in as much as we had, only when we really had to and if the situation suited it. 

In Day 3 of filming we went to Pettswood to film the tunnel walk.

The day was a little bit overcast but other then that, filming went ok. The night before it had rained so it gave us the perfect backdrop, as it was wet, so it gave the allusion of dampness, cold and dark which we wanted.

We also managed to get a really nice shoot in of me walking down the tunnel and train went by at the same time. 

No comments:

Post a Comment